Developing Steps

  • 2012

  • 2013

  • 2014

  • 2015

  • 2016

  • 2017

  • 2018

  • In July 2012 Established Bontac Bio-engineering (Shenzhen) Co., Ltd., located in Taohuayuan High-tech innovation park, Xixiang, Baoan, Shenzhen.
  • In August 2013 Bontac was supported by the first special fund by shenzhen municipal government for the development of bio-high-tech industry.
    In June 2013 the first coenzyme production line was officially online.
  • In April 2014 the first Chinese invention patent "the method of synthesizing bilirubin by immobilizing enzyme" was authorized. It achieved the breakthrough of none independent intellectual property rights of the company.
  • In January 2015 the company completed the first round of financing and introduced the domestic professional investment institution of biomedical science。
    In April 2015 the Chinese invention patent "nicotinamide mononucleotide adenylyltransferase mutant and its coding gene and application" was authorized. The patent allows Bontac to independently produce NADH, hence to break the monopoly of foreign company on the raw materials.
    In July 2015 Bontac passed the national high-tech enterprise certification .
    In August 2015 the company established the first green biosynthesis research institute.
    2015年10月 获得NADH 的QS证书。
  • In June 2016 the company signed a contract with the Sanghai industrial park of Nanchang economic and technological development zone to build the world's first green biosynthesis industrial park based on enzymatic catalytic technology. It covered an area of 3800 mu.
    In July 2016 Bontac was granted 30 million equity funds for strategic emerging industries and future industrial development of Shenzhen municipal development and reform commission.
    In October 2016 the chairman of Bontac, Rongzhao Fu attended the 2016 National Mass Innovation and Entrepreneurship Week hosted by prime minister Keqiang Li in shenzhen , and had a collision of innovation thoughts with 87 famous innvators from 12 countries and regions of the world.
  • In September 2017 30,000 square meters of enzyme production plant was built and put into operation
    In December 2017 20,000 square meters of coenzyme production plant was built .
  • In 2018 In 2018, won Shenzhen Scientific and Technological Progress Award
    In September 2018 In September 2018, approved for the first provincial coenzyme
     engineering center in China
    In 2018 In 2018, 24 new patent applications for invention; a total of 105 patent applications
    and 44 patent cooperation treaties; 14 patent authorizations